国产亚洲卡一卡二卡三_亚洲成人一级日韩精品麻豆_成人精品免费无码片区在线观看_欧美熟女亚洲视频_成人毛片久久免费观看_亚洲最大综合色一区_国产欧美一区二区精品性色国产手机在线精品_18女人腿打开无遮掩免费_日本人妻最新在线中_大香蕉丝袜亚洲国产

NEWS

GROUP NEWSstrive for advanced technology and try to be the best in the industry

Henan Kelong Power Material Co., Ltd. announced the completion of the first phase of the project with an annual output of 36,000 tons of high-performance power battery cathode materials

2018-09-15Author : admin

Henan Kelong Power Material Co., Ltd. is located at the northeast corner of the chemical and physical power supply industrial park, Xinqi Street and Chuangye Road, Xinxiang City, Henan Province. The planned plant area is about 178 acres, and the main product is planned to produce 36,000 tons of high-performance power batteries per year. Positive* materials, the project environmental impact assessment was approved and implemented by Xinxiang Environmental Protection Bureau in April 2018 (Xinhuan Shushen [2018] No. 23), and the implementation began simultaneously. In September 2018, completed the construction tasks of precursor workshop 2 and supporting environmental protection facilities, switch stations, boiler rooms, supporting pipe networks, and supporting roads in the construction content of the first phase of the project, forming a ternary power lithium battery with 6000 tons/year The production capacity of positive* material precursors meets the environmental acceptance conditions for the completion of construction projects. On September 6, 2018, our company organized an annual output of 36,000 tons of high-performance power battery positive* materials project in accordance with the requirements of the "Interim Measures for the Environmental Protection Acceptance of Construction Projects" (Guohuangui Environmental Assessment [2017] No. 4) During the environmental protection acceptance meeting for the completion of the 6000-ton/year power lithium battery ternary positive* material precursor production line and supporting facilities, the participants reached a consensus and believed that: during the construction of the project, the environmental pollution Prevention and control measures, sound environmental protection system, normal operation of environmental protection facilities, and the emission concentration of various pollutants have reached the relevant requirements of the national emission standards, and the project is agreed to pass the acceptance.


   Henan Kelong Power Material Co., Ltd.


  2018-9-15